|
|
Revision:
|
-
|
![](/images/spacer.gif) |
PID_NUM:
|
95757
|
![](/images/spacer.gif) |
PROJECT_NUM:
|
170297
|
![](/images/spacer.gif) |
SHEET_NUM:
|
-
|
![](/images/spacer.gif) |
COUNTY:
|
OTT
|
![](/images/spacer.gif) |
RT_SECTION:
|
SR 105/SR 163-10.53/13.19
|
![](/images/spacer.gif) |
PROJECT_TYPE:
|
TWO LANE RESURFACING
|
![](/images/spacer.gif) |
LET_DATE:
|
05/11/2017
|
![](/images/spacer.gif) |
Document Type:
|
Conformed
|
![](/images/spacer.gif) |
![](/images/spacer.gif) |
File Name:
|
95757-conformed.pdf
|
![](/images/spacer.gif) |
File Size:
|
6,813,328 bytes
|
![](/images/spacer.gif) |
MIME Type:
|
application/pdf
|
![](/images/spacer.gif) |
![](/images/spacer.gif) |
Imported:
|
06/28/2017
|
![](/images/spacer.gif) |
Modified:
|
06/28/2017
|
![](/images/spacer.gif) |
Released:
|
06/28/2017
|
|