|
|
Revision:
|
-
|
![](/images/spacer.gif) |
PID_NUM:
|
107408
|
![](/images/spacer.gif) |
AMENDMENT_NUM:
|
ebsx
|
![](/images/spacer.gif) |
PROJECT_NUM:
|
240202
|
![](/images/spacer.gif) |
COUNTY:
|
CUY
|
![](/images/spacer.gif) |
RT_SECTION:
|
IR 490-00.00 Major Rehab (PART 1 AND PART 2)
|
![](/images/spacer.gif) |
PROJECT_TYPE:
|
MAJOR RECONSTRUCTION
|
![](/images/spacer.gif) |
LET_DATE:
|
04/18/2024
|
![](/images/spacer.gif) |
Document Type:
|
EBS
|
![](/images/spacer.gif) |
![](/images/spacer.gif) |
File Name:
|
CUY107408.ebsx
|
![](/images/spacer.gif) |
File Size:
|
24,846 bytes
|
![](/images/spacer.gif) |
MIME Type:
|
application/bid
|
![](/images/spacer.gif) |
![](/images/spacer.gif) |
Imported:
|
02/08/2024
|
![](/images/spacer.gif) |
Modified:
|
02/08/2024
|
![](/images/spacer.gif) |
Released:
|
02/08/2024
|
|